Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
ReAdvertisement - High Point, NC - SCADA System Upgrade Eastside WWTP, Bid 25-022124

Work under this contract consists of furnishing personnel, equipment, and materials to supply a fully functional SCADA system that will communicate seamlessly with the existing Eastside Data Highway Plus control network as well as the new SCADA software and PCs. The Integrator shall furnish a single SCADA system that incorporates the existing Plant SCADA and the Incineration SCADA system into one complete and full functional system. Mandatory Base Bid General Summary - To Be Included But Not Limited to the following: A. Project SCADA Software Ignition by Inductive Automation. Program screens, reports, update tags and other listed tasks. B. New Eastside Residuals SCADA PCs. C. New Eastside WWTP SCADA PCs. D. New Operator’s reporting, design, hardware, and software. E. Bluetooth Communications to handheld reporting collections device. F. Modification and Upfit of the New Server Room. G. New Server Rack hardware and software. H. New Backup System and procedures. I. Modification of existing PLC2 to communicate with the New Redundant PLCs 20&21 over Ethernet. J. The Installation of new fiber optic cable between the New Server rack and the New Switch in the Residuals building. K. Ash Slurry Drying Bed PLC Installation, Programming and Fiber Optic cabling/hardware.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.