Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Johns Island, SC - Mt Zion Elementary School Portable Classrooms

This Scope of Work includes, but is not limited to, provide the infrastructure, and make tie in connection to the utility company power, water, and sewer services. In addition, provide underground conduits and handholes for the fire alarm, security alarm, and IT conduits from Eight New Modular Classrooms and one Restroom Facility provided by Modular Genius. The new modular unit’s infrastructure will be connected to the existing Lucy Beckham High School facility. 1. This scope will also include demolition of three electrical light poles and concrete bases, select curb and gutter, and any existing concrete flatwork associated with the installation of the utility infrastructure. Scope of work includes, but is not limited to, renovation of two (2) mobile classrooms, installation of steps, ramps, and walks, site work to include outfall, drainage, detention pond, and all associated work as illustrated in the Architect/Engineer drawings dated 1/31/2022.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.