Planroom Options
Bidroom Homepage
Public Projects
Password Projects
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
Kernersville, NC - Thomas Drake Court Culvert Replacement (20180394.00.RA)
The Project includes the following Work:
1. The Thomas Drake Court Culvert Replacement project includes but is not limited to the following:
a. Replacement of an existing 60-inch Corrugated Metal Pipe (CMP) culvert under Thomas Drake Court with a proposed 60-inch Reinforced Concrete Pipe (RCP).
b. Streambank grading and stabilization plantings.
c. Custom Cast-in-place drainage structures.
d. Asphalt removal and replacement.
e. Select tree removal.
f. Boulder toe wall construction with associated streambank stabilization grading.
g. Traffic Control.
The Project has an expected duration of 150 days.
You must
log in
to view these files.
If you do not already have an account, you can freely register for one by going
here
.