Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Mt. Pleassant, SC - Lucy Garrett Beckham High School Modular Classrooms – Outside Utility Package

This Scope of Work includes, but is not limited to, provide the infrastructure, and make tie in connection to the utility company power, water, and sewer services. In addition, provide underground conduits and handholes for the fire alarm, security alarm, and IT conduits from Eight New Modular Classrooms and one Restroom Facility provided by Modular Genius. The new modular unit’s infrastructure will be connected to the existing Lucy Beckham High School facility.

1. This scope will also include demolition of three electrical light poles and concrete bases, select curb and gutter, and any existing concrete flatwork associated with the installation of the utility infrastructure.
2. Contractor shall maintain the construction entrances. This shall include (but not necessarily be limited to) grading, filling of ruts and potholes, and maintaining proper drainage. Maintenance of entry gates shall also be the contractor’s responsibility. Adjacent public streets, sidewalks, curbs, and parking lots shall be swept, scraped, washed and kept clean daily (more often as necessary) throughout all operations.
3. Contractor to schedule his work in accordance with all noise ordinances per the authority having jurisdiction.
4. Contractor is responsible for grounds maintenance along the perimeter fence.
5. Contractor shall provide a project specific safety plan prior to mobilization.

The Owner has retained the services of a Program Manager to represent the Owner's interest during the construction of the work.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.