Mt. Pleasant, SC - Lucy Garrett Beckham High School Modular Classrooms – Building Completion Package

This Scope of Work includes, but is not limited to, provide the infrastructure, connect power, water, sewer, fire alarm, security alarm, and IT conduits to Eight New Modular Classrooms and one Restroom Facility provided by Modular Genius. The new modular unit’s infrastructure will be connected to the existing Lucy Beckham High School facility. The work will include the following: (specified by CCSD)

a. Standard pressure treated wood lattice framed with 1’x4” pressure treated lumber
b. Carpet squares and Vinyl to be furnished and installed by Owner
c. Signage specified by CCSD, and indicated on the drawings
d. Fencing as per design drawings, furnished and installed by the Owner.
e. Interior partitions, doors/frames and hardware to be provided and installed by Modular Genius
            