Johns Island, SC - Mt. Zion ES – Auldreeke Road Water Main Improvements

The scope of work includes but is not limited to the removal of walls between rooms This Scope of Work includes but is not limited to the extension of existing water main within right-of-way, including required pavement cuts, milling, and trenching at River Road, trenching and installation of new 8” PVC water main extension, fire hydrant, and 2- inch water meter as illustrated in A/E drawings provided dated 1/22/2022 revision 2.
            