Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Simpsonville, SC - Greenville Technical College - Bldg. 201 Soffit Replacement

Base Bid work includes complete removal and replacement of the existing soffit system and accessories.

* Reset/reseal existing VR fiberglass batt insulation with new taped joints where open or missing.

* Replacement of damaged light gage framing and batt insulation based on unit price quantities.

* Set new J Trim and eave closure for soffit system.

* Provide perforated soffit panels or solid soffit panels and vented panel at outside edge (minimum 6 inches) wide.

* Provide panel clips, soffit laps and soffit joints for entire perimeter of facility.

* See drawings/details.

* Alternate Number 1 work includes beehive strainers at all downspouts and clean out all gutters and downspouts to grade. Post the attached advertisement and summary of work.

            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.