Planroom Options
Bidroom Homepage
Public Projects
Password Projects
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
Simpsonville, SC - Greenville Technical College - Bldg. 201 Soffit Replacement
Base Bid work includes complete removal and replacement of the existing soffit system and accessories.
* Reset/reseal existing VR fiberglass batt insulation with new taped joints where open or missing.
* Replacement of damaged light gage framing and batt insulation based on unit price quantities.
* Set new J Trim and eave closure for soffit system.
* Provide perforated soffit panels or solid soffit panels and vented panel at outside edge (minimum 6 inches) wide.
* Provide panel clips, soffit laps and soffit joints for entire perimeter of facility.
* See drawings/details.
* Alternate Number 1 work includes beehive strainers at all downspouts and clean out all gutters and downspouts to grade. Post the attached advertisement and summary of work.
You must
log in
to view these files.
If you do not already have an account, you can freely register for one by going
here
.