Lake City, SC - Lake Swamp WWTP Upgrade

* Demolition of existing rotating biological contact basins, Aeration Basin No. 3, and Aerobic Digester No. 4. Demolition to include removal and disposal of solid and liquid waste.
* Rehabilitation of clarifier equipment for Clarifier Nos. 1, 2, and 3.
* Replacement of dry pit RAS pumps with self-priming pumps.
* Submersible scum pump replacement.
* Blower replacement.
* Refurbishment of belt press.
* New septage receiving station.
* New aeration basin.
* New blower building.
* New generator and automatic transfer switch.
* New transfer switch for effluent pump generator.
* Associated civil, electrical, and HVAC work required for construction of the facilities.

A portion of the project is being funded by a loan from the State Revolving Fund and that bidders must comply with all applicable state and federal requirements identified in the bid documents – including Davis-Bacon and “American Iron and Steel” Provisions. The project's disadvantaged business enterprise (DBE) goals are 2.5% MBE and 2.5% WBE. Prospective bidders must implement procedures that ensure that DBE firms are given opportunities for meaningful participation if subcontracts are awarded. Bidders must provide a 5% bid bond.

            