Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Jamestown, NC - Guilford Technical Community College - Jamestown Central Plant East Phase 1

The project consists of a new central utility plant building for heating hot water and chilled water distribution to three existing buildings, installation of a new Owner-Furnished natural gas powered electric generator and other Work indicated in the Contract Documents. Phase 1 work includes a new pre-engineered metal building and site work associated with new underground thermal utility piping. Existing air-cooled chiller piping and control wiring to Davis Hall will be interrupted and reconnected through the new plant building. Phase 1 will complete site work needed to enable installation of new air-cooled chiller, boilers, pumps, and hydronic accessories in future Phase 2. Electrical work in Phase 1 will include installation of a new Owner-Furnished generator, relocation of an existing automatic transer switch (ATS), new outdoor switchgear, and refeeding of electrical service to existing buildings Service Careers and James Williams Hall. Selected Phase 2 drawings are included for informational purposes to coordinate work in Phase 1. Bids will be received for single prime contract type only. All proposals shall be lump sum.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.