Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Winchester, OH - Alexander Salamon Airport - RemoveTW B, Reconstruct TW A & Apron (16027)

This Project is to demolish and remove the existing partial parallel Taxiways and then reconstruct a new partial parallel taxiway to the northeast and tie into the end of Runway 5-23 (Runway 23 End) at the Alexander Salamon Airport (AMT) in Winchester (West Union), Ohio. The project is planned to include, but not be limited to the following general project elements:

1. Demolish and remove approximately 14,000 square yards of bituminous asphalt taxiway pavement, demolish and remove existing taxiway edge lights, edge markers, airfield guidance signs, lighted wind-tee, drainage pipe and drainage structures. Then regrade the area (approximately 4,500 CY, FAA specification P-152) unclassified excavation to promote positive drainage and comply with FAA grading criteria to construct a new partial parallel taxiway and connector taxiway.
2. Mill (approximately 1,900 SY, 2” nominal depth) and replace Airport entrance drive with ODOT specification asphalt concrete surface course pavement (approximately 300 tons).
3. Construct partial parallel taxiway and connector taxiway pavement consisting of FAA specification P-401 bituminous asphalt (approximately 1,800 tons), P-209 crushed aggregate base course (approximately 1,500 CY), P-154 sub-base course (approximately 1,000 CY) on top of a P-155 lime-treated (approximately 240 tons) subgrade.
4. Construct drainage inlet structure (1 EA) and RCCP pipe culvert (approximately 90 LF).
5. Relocate and Install airfield guidance signs (3 EA), medium-intensity taxiway and runway edge lights (8 EA).
6. Install L-108, L-824C, #8, 600V (approximately 2,300 LF) and 5kv (approximately 1,500 LF) electric cable in conduit or duct.
7. Install L-108, #6 solid bare counterpoise wire in trench (approximately 1,300 LF).
8. Install L-110, 2” PVC conduit in trench (approximately 1,200 LF).
9. Install L-125 stake mounted taxiway edge reflective markers (38 EA).
10. Relocate existing Runway 23 approach, Runway End Identifier Light (REIL) system.
11. Relocate existing lighted wind-tee.
             
  
Sorted By Company
Click on the following links to sort by a category
Company | CSI Codes | Contact Name  | Date | Bid Category
Printer Friendly Version



  Plan Holder List for 'Winchester, OH - Alexander Salamon Airport - RemoveTW B, Reconstruct TW A & Apron (16027)'
  Company Information    CSI Codes  Contact Information  Status
Date Filled
Date Returned  
Delivery Method  
Tracking Number  
  ADB Safegate  
  977 Gahanna Parkway  
  Columbus, OH 43230  
00001 - Subcontractor  
Mike Bush  
Phone: (614) 573-8255  
Fax: (614) 573-8355  
Filled  
04/16/2021  

Download - N/A (Downloads or Other)  

  Allied Construction Industries  
  3 Kovach Drive  
  Cincinnati, OH 45215  
00012 - Planroom  
Dan Wright  
Phone: (513) 221-8020  
Fax: (513) 221-8023  
Filled  
04/08/2021  

Download - N/A (Downloads or Other)  

  Brown County Construction Co., Inc  
  8108 US 52 West  
  Aberdeen, OH 45101  
00002 - General Contractor  
Steven Pedersen  
Phone: (937) 795-2740  
Fax: (937) 795-2743  
Filled  
04/08/2021  

Ship - FedEx Overnight  
Track Item - 7733 9218 0184  
  Builders Exchange  
  9555 Rockside Road  
  Suite 300  
  Valley View, OH 44125  
00012 - Planroom  
Kristin Niemeyer  
Phone: (216) 393-6300  
Fax: (216) 393-6304  
Filled  
04/07/2021  

Download - N/A (Downloads or Other)  

  ConstructConnect  
  30 Technology Parkway South  
  Suite 100  
  Norcross, GA 30092  
00012 - Planroom  
Plan Acquisition  
Phone: (800) 364-2059  
Fax: (866) 570-8187  
Filled  
04/09/2021  

Download - N/A (Downloads or Other)  

  Kwest Group, LLC  
  8305 Fremont Pike  
  Perrysburg, OH 43551  
00001 - Subcontractor  
Estimating Team  
Phone: (614) 734-4664  
Fax: (419) 874-4306  
Filled  
04/08/2021  

Download - N/A (Downloads or Other)  

  Shelly Company  
  80 Park Dr  
  Thornville, OH 43076  
00010 - Estimator  
Adam Foshee  
Phone: (740) 246-6315  
Fax: (740) 246-4715  
Filled  
04/08/2021  

Download - N/A (Downloads or Other)  

  The Blue Book Building & Construction Co.  
  800 East Main St.  
  Jefferson Valley, NY 10535  
00012 - Planroom  
Erin McVeigh  
Phone: (800) 431-2584  
Fax: (800) 431-2584  
Filled  
04/09/2021  

Download - N/A (Downloads or Other)