Spindale (NC) Oak St. PS Interim Operation
The project is for the interim operation of the existing Oak St. Pump Station located at 683 Thunder Rd., Spindale, NC, 28160. The work consists of, but is not limited to, the following:
1. The removal and replacement of existing pumps and controls
2. The installation of a cast-in-place concrete wet well access
3. Rehabilitation of the existing wet well
4. Removal and replacement of piping, valves, and related appurtenances
5. Removal and replacement of specific electrical components