High Point, NC - Installation of Concrete Transmission Pole Foundations (Bid 11-032520)

These specifications cover the work required to install drilled pier foundations for the 100 kV Line between Eastchester Substation and Hammer Substation for the City of High Point, North Carolina. There are a total of five (5) steel reinforced cast-in-place concrete drilled pier foundations and four (4) concrete-encased direct embed pole foundations to be installed. Pier diameters range in size from 4.5 to 6.5 feet in diameter. Embedded depths vary from 15 to 30 feet.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.