Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
REBID - Conover, NC - NEWWTP Aeration System Upgrade (20180256.00.HI)

NEWWTP Aeration System Improvements, including but not limited to:

1) Upgrade of the existing sequencing batch reactor (SBR) aeration system with work to be performed separately in a pair of basins while maintaining the remaining pair of basins in operation;
2) Upgrade of the existing Blower Building and air distribution system for the SBRs;
3) SCADA system modifications required improvement to monitor and control various features of the new SBR control system provided by the SBR manufacturer; and
4) Site work, yard piping and erosion control as outlined by the drawings and all other work as described by Contract Documents.

Engineer’s Cost Estimate: $4,459,000

            

 

    

Contact:   Angela Hall
PreBid Date:   03/29/2023 02:00 PM
PreBid Info:   A pre-bid conference for the Project will be held at Conover City Hall, Council Chambers, 101 1st Street E, Conover, NC 28613
A Site visit is scheduled following the pre-bid conference. Attendance at the pre-bid conference is encouraged but not required.

Company:   W. K. Dickson & Co. Inc.
Bid Date:   06/20/2023 02:00 PM
Bid Info:   See Addendum #3/REBID
Conover City Hall, Council Chambers, 101 1st Street E, Conover, NC 28613 At that time the Bids received will be publicly opened and read.
Bids sent by mail shall be mailed to Conover City Hall, P.O. Box 549, Conover, NC 28613

Project Location: Conover, NC

Public Notes:
For information regarding this project please contact:

Angela Hall
W.K. Dickson & Co., Inc.
401 4th Street SW, Suite 201, Hickory, NC 28602
Office: 828-327-6911
Email: ahall@wkdickson.com

Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. The Owner reserves the right to reject any and all bids.

The Project has an expected duration of 540 days.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.




Job Purchase Information:
Bidding is Closed



Addenda