Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Charleston, SC - West Ashley High School Athletic Facility Addition

Scope of Work: The work includes, but is not limited to, an add of a activity room to the athletic portion of the original building on campus. It will be directly connected by hallway. It will have toilets and a fountain to serve the additional occupancy load of the addition. The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. Finishes will include but are not limited to: SVT, terrazzo, carpet, acoustical ceilings, paint and additional finishes. The package includes basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of the installation of utilities, paving, sidewalks, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD’s Educational Specifications and Design Requirements
            

 

    

Contact:   Taylor Neeley
PreBid Date:   01/04/2023 02:00 PM
PreBid Info:   Pre-Bid Conference will be hosted virtually, contact Taylor Neeley via Email for meeting invite Tneeley@BStoneGroup.com

Company:   Brownstone
Bid Date:   01/12/2023 02:00 PM
Bid Info:   Construction Procurement Services c/o Brownstone Construction Group 4055 Faber Place Drive, Suite 100 North Charleston SC 29405 SC 29405

Project Location: Charleston, SC

Public Notes:
For information regarding this project please contact:

Bobby Teachey II
Brownstone Construction Group, LLC
4055 Faber Place Drive, Suite 202, North Charleston, South Carolina 29405
Phone:704-239-9429
Email:bteachey@bstonegroup.com




Job Purchase Information:
Bidding Closed.



Addenda