REBID - Eden, NC - Contract 5a - Junction St Basin Replace & Rehab (20120031.14.RA)

The work will consist of multiple phases including:

1. Contract V-Junction Basin Rehabilitation and Replacement Project consisting of the following:

a. Wastewater Infrastructure

i. Linear Replacement and Rehabilitation

1. Approximately 530 LF of 8-inch gravity sewer replacement
2. Approximately 1,170 LF of18-inch gravity sewer rehabilitation (UV-Cured Liner)
3. Approximately 1,060 LF of 24-inch gravity sewer replacement

ii. Manhole Replacement and Rehabilitation

1. Seven (7) 5-foot diameter manhole replacements
2. Three (3) 4-foot diameter manhole replacements
3. Four (4) 4-foot diameter manhole rehabilitations

b. Water Infrastructure

i. Linear Replacement

1. Approximately 10 LF of 2-inch water main replacement
2. Approximately 575 LF of 6-inch water main replacement

2. It also entails replacement and rehabilitation of the Smith River Outfall between Kings Highway and the Junction Lift Station. This portion of the project includes the following items of work:

a. Wastewater Infrastructure

i. Linear Replacement and Rehabilitation

1. Approximately 175 LF of 8-inch gravity sewer replacement
2. Approximately 270 LF of 10-inch gravity sewer replacement
3. Approximately 430 LF of 18-inch gravity sewer replacement
4. Approximately 560 LF of 24-inch gravity sewer replacement
5. Approximately 2,550 LF of 24-inch gravity sewer rehabilitation
6. Approximately 60 LF of 30-inch gravity sewer rehabilitation

ii. Manhole Replacement and Rehabilitation

1. Two (2) 4-foot diameter manhole replacement
2. Six (6) 5-foot diameter manhole replacement
3. Six (6) 6-foot diameter manhole replacement
4. Eight (8) 4-foot diameter manhole rehabilitation

iii. Siphon Replacement

1. Replacement of the triple barrel (8-inch, 10-inch and 12-inch barrels) siphon and boxes with the same including temporary coffer dam of the Smith River
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.