REBID - Eden, NC - Eden Remediation Program - Contract IIB Junction Pump Station Rehabilitation

Contract IIB- 11 MGD Junction Lift Station Rehabilitation Project is composed of the following work:

• Converting the existing pumps to direct-coupled variable frequency drive submersible motor pumps
• Replacement of piping and valves
• Enhanced system reliability through the installation of automatic transfer switch
• Installing a permanent generator on an elevated platform supported with micro-piles enclosed by 6-FT chain link fence and a 16-Ft double swing gate
• Elevating electrical controls
• Installing an emergency pump connection for current & future pump station bypass
• General site improvements composed of earthen berm, gravel road, concrete sidewalk extension, and cattle wire fence removal & relocation.
• Water site improvements composed of type K copper 2” water main, 1-1/2” water meter, water meter box, 1-1/2” RPZ, RPZ enclosure, two (2) 2” gate valves, and a non-freeze yard hydrant.
• Demolition of existing pump motors, pump motor shafts piping and valves.
• Demolition of existing RPZ water valve vault
• Cleaning and inspection of the wet well (as an additive bid)
            