Loudon, TN - Low Volume PS Improvements (20190316.00.KV)

The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required to construct complete, in place, and ready to operate the following:

The work will generally consist of providing:

Construction of one 120 gpm submersible grinder/chopper pump station at the Steekee Road site, including all structures, piping, valves, flow meter, sitework, force main and gravity sewer indicated and/or specified.

Construction of one 140 gpm submersible grinder/chopper pump station at the Green Acres site, including all structures, piping, valves, flow meter, sitework, force main and gravity sewer indicated and/or specified.

Construction of one 150 gpm submersible grinder/chopper pump station at the Highway 11 site, including all structures, piping, valves, flow meter, sitework, force main, and gravity sewer indicated and/or specified.

The work will be awarded in one Contract.
            