Planroom Options
Bidroom Homepage
Public Projects
Password Projects
Calendar
Log In
Version 6.0.11.11
Information
Plan Holders
View Plans
Addenda
Spec Sheets
Jamestown, NC - GTCC Jamestown Central Plant – East – Phase 2
The project consists of new heating hot water and chilled water distribution to three existing buildings, installation of new heating water boilers, pumps, hydronic accessories, DDC controls and other Work indicated in the Contract Documents. Phase 1 work, performed concurrently by a separate contractor includes a new central plant building and site work associated with new electrical distribution. Existing air-cooled chiller piping and control wiring to Davis Hall will be interrupted and reconnected through the new plant building. Phase 2 includes alternate bids for a new chilled water pumps, piping, and a new air-cooled chiller. The Phase 2 Contractor will be required to coordinate with the Phase 1 Contractor for project scheduling, sequencing, and site work.
Bids will be received for single prime contract type only. All proposals shall be lump sum.
You must
log in
to view these files.
If you do not already have an account, you can freely register for one by going
here
.