Lyman, SC - WWTF Modifications

The project consists of upgrades: Install new 85-foot diameter clarifier. Replace existing sludge pumps with new pumps in new dry pit pump station. Install new pumps in an existing wetwell to pump decant from the sludge thickener and process water from the existing belt press. Replace existing 8-inch RAS line with 14-inch. Improvements and modifications to two existing 85-foot diameter clarifiers.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.