REBID - Union County - Jail Generator Replacement and Alternate Water Source
Replacement of the existing 180 kW, 480/277V generator with a County owned 600 kW, 480/277V generator. The existing associated gear is to be replaced. The existing generator is to be returned to the County. Two 30,000 gallons above ground water tanks are to be installed along with auxiliary pumps to supplement the domestic water system. The existing back flow preventers are to be relocated and associated water distribution water supply piping.
The Work shall be completed in a single phase. The Work includes coordinating with the Sheriff’s Department for access, security, and shut-downs.