Ada, OK - Ada Regional Airport - Construct Terminal Apron-Phase: II (19083)

This project is to construct the second phase of the concrete terminal apron; the first phase was completed in 2018. The project has been divided into three alternates. Alternate 1 includes the construction of the northern, central, and southern P.C.C. terminal apron expansion; installation/modification of drainage features; installation of electrical features; demolition of existing gravel pavement; installation of apron tie-downs; and application of markings. Alternate 2 includes the construction of central and southern P.C.C. terminal apron expansion; installation/modification of drainage features; installation of existing gravel pavement; installation of apron tie-downs; and application of markings. Alternate 3 includes the construction of southern P.C.C. terminal apron expansion; installation/modification of drainage features; installation of electrical features; demolition of existing gravel pavement; installation of apron tie-downs; and application of markings.
            

 

    

Contact:   Cheryl Rodriguez
PreBid Date:   04/07/2021 10:00 AM
PreBid Info:   Ada Regional Airport Terminal Bldg., 300 Ray Stout Blvd., Ada, OK 74820

Company:   Delta Airport Consultants Inc.
Bid Date:   04/22/2021 02:00 PM
Bid Info:   Ada Regional Airport Terminal Bldg., 300 Ray Stout Blvd., Ada, OK 74820

Project Location: Ada, OK View a Map of this Location

Public Notes:
For information regarding this project please contact:

Matthew Ranck
Delta Airport Consultants, Inc.
110 N. Robinson Ave. Suite 250 Oklahoma City, OK 73102
Phone: 405.605.4992
Email: mranck@deltaairport.com

Bids must be accompanied by a certified check or a bid bond in the amount of not less than 5 percent of the total amount bid. A Contract Performance Bond and a Contract Payment Bond each equal to 100 percent of the Contract Price will be required for the successful Contractor. No bid may be withdrawn for a period of 90 calendar days after the date of receiving bids.



Job Purchase Information:
Bid Closed

A copy of Final Bid Tabulation can be viewed by clicking HERE