Sevierville, TN - Pump Station Upgrades for Dumplin Creek, Johnson Rd, and City Garage (20180306.00.KV)

The work to be performed under this Contract shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required to construct complete, in place, and ready to operate the following:

1. Install one 300 gallon per minute (GPM) vacuum prime sewer pump station adjacent to the existing Dumplin Creek Pump Station, including all piping, valving, and appurtenances to complete the sewer pumping station.
2. Install one 450 GPM vacuum prime sewer pump station on the proposed site near Johnson Road and Seaton Way, including all piping, valving, and appurtenances to complete the sewer pumping station.
3. Provide approximately 560 linear feet (LF) of 8-inch polyvinyl chloride (PVC) pipe sanitary pressure main between the existing and proposed Johnson Road Pump Station, including all associated pipe, fittings, and valves.
4. Decommission the existing Johnson Road Pump Station.
5. Install one 200 GPM vacuum prime sewer pump station adjacent to the existing City Garage Pump Station including all piping, valving, and appurtenances to complete the sewer pumping station.
6. Provide approximately 550 LF of 8-inch PVC pipe gravity sanitary sewer, including all associated pipe, precast manholes, and appurtenances.

The work will be awarded in one Contract.
            