Raleigh (NC) Water Oberlin Road Project

The installation of approximately 6,100 linear feet of 12-inch ductile iron water main on Oberlin Road between Davis Street and Bedford Avenue and corresponding abandonment of existing 8” cast iron main along the same corridor. The work includes replacement of existing hydrants, reconnection of intersecting mains, replacement of water services, a 36-inch bore and jack of Wade Avenue, a 12-inch check valve assembly within Wade Avenue, and associated paving, restoration, and traffic control to provide a complete and operable water system. Additionally, the project includes replacement of portions of the sanitary sewer system along the corridor totaling approximately 2,000 linear feet of 8-inch ductile iron gravity sewer.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.