Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.11.11

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
High Point, NC - Oak Hollow Lake Dam Drainage Improvements, (Bid 6040-051320)

Work under this contract consists of construction of approximately 250 LF of drain pipe and appurtenances to control seepage and standing water downstream of the Oak Hollow Lake dam. Additional re-grading will be required to provide positive drainage toward existing and proposed inlets. These construction documents include a filter drain system to collect and control this seepage and surface drainage improvements in this area. Work of the Project includes furnishing all labor, materials, tools, and equipment required to install the filter drain system and improve surface water drainage as shown on the Drawings.
            
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.