Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.6.1

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
High Point, NC - North Main Street and Lexington Avenue Intersection and Utility Improvements (10-112019)

Work under this contract consists of furnishing personnel, equipment and materials to install 100 linear feet of 6 inch ductile iron water pipe, 40 linear feet of 8 inch ductile iron water pipe, 540 linear feet of 12 inch ductile iron water pipe, 13,690 linear feet various sizes of 40 P.V.C duct bank pipe, various size vaults; and intersection improvements including, patterned pavement, curb ramps, sidewalk, monolithic islands, tracer wire conduit (for pedestrian signals and mast-arms to be installed by others), thermoplastic marking, temporary traffic control, and asphalt paving.
           Place Order 
You must log in to view these files.

If you do not already have an account, you can freely register for one by going here.