Planroom Options

Bidroom Homepage

Public Projects
Password Projects
Calendar

Log In
Version 6.0.6.1

 
 
   Information  
 
 
   Plan Holders  
 
 
   View Plans  
 
 
   Addenda  
 
 
   Spec Sheets  
 
Greensboro NC - Murrow Boulevard Roadway Improvements and Downtown Greenway Phase 2 (2009-056)

The contract includes construction of approximately 1,150 square yards (SY) of 12-foot wide concrete greenway trail along Fisher Avenue between North Greene Street and the Church Street overpass including new curb and gutter. A replacement waterline is included from North Greene to Smith Street and an extension to connect into Church Street. The construction will also include approximately 5,500 linear feet of 12-foot wide asphalt concrete greenway trail along Murrow Boulevard from the Church Street overpass to East Gate City Boulevard to include new curb and gutter and storm drainage revisions. Modifications for pedestrian and bicycle safety will be retrofitted onto the Summit Avenue bridge over Murrow Boulevard and onto the Murrow Boulevard bridges over Church Street and the Norfolk Southern Railroad. The intersection of Murrow Boulevard and East Gate City Boulevard will be completely reconstructed requiring reconstruction of Murrow Boulevard from the Gorrell Street overpass to East Gate City Boulevard. The existing traffic signals will be replaced or modified at the five intersections along Fisher Avenue and Murrow Boulevard between Elm Street and East Gate City Boulevard including new mast arms at three of them.
           Place Order 

 

    

Contact:   John Fersner
PreBid Date:   08/16/2018 11:00 AM
PreBid Info:   300 West Washington St. Greensboro NC

Company:   City of Greensboro
Bid Date:   08/30/2018 03:00 PM
Bid Info:   300 West Washington St. Greensboro NC

Project Location: Greensboro, NC

Public Notes:
For information regarding this project please contact:

Donald Saintsing
City of Greensboro Engineering and Inspections Department
300 West Washington Street, Greensboro, North Carolina
Phone: 336-373-7966
Email: Donald.saintsing@greensboro-nc.gov




Job Purchase Information:
THIS IS THE OFFICIAL SITE TO ORDER THE BID DOCUMENTS FOR THIS PROJECT - AND THE ONLY WAY TO BE ADDED TO THE PLAN HOLDERS LIST!

A printed bid set is $600.00 plus applicable sales tax.

A printed bid set & CD is $625.00 plus applicable sales tax.

A set is also available for download from this site in PDF for $450.00 plus applicable sales tax. Downloads do not include addenda, they are all available on the "Addenda" tab of this page. Once payment is secured, you will receive an email that your files are ready to download from your account.

To place an order click on "PLACE ORDER" at the upper right of this page.

Payment can be made by either:
1.Credit Card
2.Check made payable to Duncan-Parnell - mail check to: 4275 Regency Dr #100, Greensboro, NC 27410 ATTENTION: Anthony. Printing will not begin until the check is received
3.Cash - pick up orders only
4.Duncan-Parnell Account


Purchase of entire bid set includes all plans and specifications, including any addenda released at time of order. Planholders will be notified by email when future addenda are issued and it will be the responsibility of each plan holder to download the addenda. Shipping, if required, will be charged to each order.

Online orders are fulfilled within 1-2 business days.

ADDENDA DISTRIBUTION

Existing planholders will be notified by email upon the release of any addenda. Failure to order bid sets through Duncan-Parnell may prevent you from being notified of issued addenda. Printed copies of addendum will be available at no additional charge. Shipping, if required will be charged. Contact your local Duncan-Parnell office to request a printed set of addenda files. Click here to find the location nearest you.

Addenda notifications are sent via email from the mail account of “addendaNotification@dpibidroom.com” and could be flagged as spam by your company network firewall. To prevent not receiving timely notification of these addenda, please contact your company Information Technology Manager and ask that he “white list” the domain of dpibidroom.com to prevent emails from being captured.