Planroom Options
Bidroom Homepage
Public Projects
Private Jobs
Calendar
Log In
Version 6.0.5.48
Information
Plan Holders
View Plans
Addenda
Spec Sheets
N. College Street and 5th Street Streetscape and Storm Drainage (512-11-047)
The project will widen the sidewalk along the east side of 5th Street from Light Rail to N College Street. Also, project will reconfigure the radius on the west side to eliminate the long and skewed pedestrian crossing. The storm water project will upgrade storm drainage pipe in College Street from 5th Street to Trade Street.
Name
Delivery Method
Date
Addendum_#1.pdf
Email
3/19/2012
Addendum_#2.pdf
Email
3/21/2012